top of page

40HQ SHED & TICKET OFFICE

Oct 5, 2020
1 min read

Updated: Oct 16, 2020

SOURCE CHINA Direct Factory Construction Projects.

An existing client

Phase 1 Project Amusement Waterpark with 40HQ SHED & TICKET OFFICE, will house Golf cart, kayaks, stand up paddle boards, life jackets and various equipment

Competed ‘Comparative Report from over 45 Chinese factories we shortlisted 5 suppliers..

To view free report:

Specs;

  • 40HQ fully marine cladded sea blue motley

  • Shed & Ticket office partition ticketing window

  • Handrail, gates and ramps

  • 40HQ SHED 2
  • 40HQ SHED 1
  • 40HQ SHED 6
  • 40HQ SHED 3
  • 40HQ SHED FITOUT 1
  • 40HQ SHED FITOUT 2
  • PLAN VIEW OFFICE CAFE
  • SHED concept
  • Project 2NL

  • Water drainage

  • Plumbed and wired

  • 3* 2m x 3m gas hinge side opening walls

  • Exhaust fan & AC installed

  • Off grid backup generator

  • Fully secured lock up

  • LED lighting fitted

Production date: October 2020

Installation date: January 2021

Our client is existing consultant and construction in Pacific Islands, govt contract, commercial aspects.

Signup newsletter: https://www.dracon.co.nz/

Follow us on: https://www.facebook.com/DraconNZltd

My Blog: https://www.dracon.co.nz/current-events

Subscribe to my YouTube: https://www.youtube.com/channel/UC7LSWZP10pjy4KWUia0xIYA?

 
 
 

Comments


Serious about sourcing China?

 

If you have drawings, specifications and a real project, send your scope — we'll tell you honestly if we're the right partner.

DRACON INTERNATIONAL TRADING HK CO., LIMITED

BIjh5NJe (1) MOB WEB.png

Connect to our Platforms

  • Whatsapp
  • LinkedIn
  • Facebook
  • YouTube
  • Instagram
bottom of page